Skip to content

Alvarado’s quick turnstile solution allows Harrah’s to meet Missouri Gaming Commission deadline. Alvarado shipped 16 of its SU500 barrier-free optical turnstiles within 10 days, allowing the integrator to install the optical turnstiles and GateWatch patron counting software in time to meet the project completion deadline.

Alvarado’s quick turnstile solution allows Harrah’s to meet Missouri Gaming Commission deadline

Background

Harrah’s Casino needed optical turnstiles to count guests entering and exiting the gaming area at its St. Louis, Missouri property.

Harrah’s originally decided to try product from another turnstile company. The other supplier was given over 14 weeks to deliver the product to meet timelines set by the Missouri Gaming Commission.

Challenge

Shortly before the delivery date, the supplier sheepishly told Harrah’s and its integrator, Siemens Building Technologies, that delivery of its product would be at least two weeks late – because the product was coming from Europe.

This put Harrah’s in a real bind. If the optical turnstiles weren’t installed by the gaming commission deadline, Harrah’s faced hefty fines. Harrah’s turned to Alvarado for help.

“The original supplier really let us down. Alvarado’s world-class operation bailed us out and really saved the day.”
– Steve Lemon, Senior Project Manager – Siemens Building Technology

Solution

After discussing the situation with Harrah’s and Siemens, Alvarado agreed to manufacture and ship 16 of its Supervisor 500 barrier free optical turnstiles within 10 days. This would allow Siemens to install the optical turnstiles and Alvarado’s GateWatch patron counting software in time to meet the project completion deadline.

Impact

Alvarado’s ability to respond quickly allowed Harrah’s to meet its requirements. The products installed easily and worked well right out of the box.

Alvarado Advantage

As a thriving U.S.-based manufacturer, Alvarado has invested in the resources, technology and training that allow it to manufacture, ship and service product an average of 35% faster than competitors.

Even faster shipping is available through Alvarado’s very popular QuickShip program, which enables Alvarado to meet most customer requirements in record time.

Back To Top